Why was the Gibe III dam built?

Why was the Gibe III dam built?

Starting in 2008, construction of the Gilgel Gibe III Dam on the river upended that life for subsistence farmers, cattle herders, and fishermen, who depended on the Omo’s natural flow to sustain their livelihoods.

Who built Tekeze Dam?

Ethiopian Electric Power Corp.
The dam is part of the Ethiopian government – funded $365 million Tekezé hydroelectric power project that is being built by state-owned Ethiopian Electric Power Corp. (EEPCo) and the Chinese National Water Resources and Hydropower Engineering Corp.

Is the first hydro plant in Ethiopia?

In East Africa, the Gilgel Gibe III hydroelectric power plant generated its first electricity on the 10th of October. The hydroelectric plant will have 1,870MW installed capacity upon completion, made up of ten 187MW turbines.

How much hydroelectric power does Ethiopia have?

Ethiopia has the second largest hydropower potential in Africa, with only 10% developed to date but nonetheless covering 90% of the nation’s electricity demand. Currently, installed capacity is about 4,330 MW of hydro, but more than 6,600 MW are under construction.

Where is the Gilgel Gibe 3 hydroelectric power project located?

The Gilgel Gibe III (Gibe III) hydroelectric power project can generate 1,870MW of electricity. Credit: Mimi Abebayehu / Shutterstock. The Gibe III project was constructed on the Omo River in Ethiopa.

Where is Gilgel Gibe 3 Dam in Ethiopia?

/  6.84722°N 37.30139°E  / 6.84722; 37.30139 The Gilgel Gibe III Dam is a 250 m high roller-compacted concrete dam with an associated hydroelectric power plant on the Omo River in Ethiopia. It is located about 62 km (39 mi) west of Sodo in the Southern Nations, Nationalities, and Peoples’ Region.

What was the original design of Gilgel Gibe dam?

The power house contains ten 187 MW generators supported by Francis turbines for a total installed capacity of 1,870 MW. The initial design of the dam foresaw a rock-fill dam. However, due to difficulties with obtaining proper and sufficient insurance coverage for the rock-fill dam, the design has been changed to roller-compacted concrete.

Who is the Prime Minister of Gilgel Gibe dam?

The dam was inaugurated by Prime Minister Hailemariam Desalegn on 17 December 2016. Local and international environmental groups expect major negative environmental and social impacts of the dam and have criticized the project’s environmental and social impact assessment as insufficient.

About the Author

You may also like these