What is the difference between practical completion and final completion?

What is the difference between practical completion and final completion?

Practical completion is the date nominated in the contract for the works to be substantially completed and available for use. This may be subject to change. At the satisfactory completion of any required rectification work, your architect will issue the final certificate.

What is a certificate of substantial completion?

Certificate of Substantial Completion means a certificate prepared by the Design/Builder and forwarded to the Owner stating that the Project is sufficiently complete so it can be used for its intended purpose.

What is a certificate of practical completion?

Certificate of Practical Completion. A certificate issued to the contractor by the superintendent or the superintendent’s representative when the works under the contract have reached the stage of completion described in the general conditions of contract.

What is considered practical completion?

Practical completion is a term that is misunderstood by many home buyers. Generally it means the point where all building work is complete or all but completed, in accordance with the contract, and the house is reasonably fit for occupation.

Who signs off practical completion?

The contract administrator certifies practical completion when all the works described in the contract have been carried out. Certifying practical completion has the effect of: Releasing half of the retention (an amount retained from payments due to the contractor to ensure they complete the works).

How long is practical completion stage?

7-8 weeks
Practical completion stage: 7-8 weeks.

Who signs certificate of substantial completion?

You can apply substantial completion to a complete project, or to just one part of a project. In both cases, the owner and the contractor sign a certificate of substantial completion.

How is substantial completion determined?

1 of the American Institute of Architects (AIA) defines substantial completion as: the stage in the progress of the Work when the Work or designated portion thereof is sufficiently complete in accordance with the Contract Documents so that the Owner can occupy or utilize the Work for its intended use.

What is needed for practical completion?

There is no standard definition of practical completion. Generally, it is the point at which a building project is complete, except for minor defects that can be put right without undue interference or disturbance to an occupier.

What triggers practical completion?

To achieve Practical Completion, the Contractor must comply with clause 2.37 (JCT Design and Build) and provide the Employer with contractor’s design documents and any related information specified in the Contract that show or describe the work (i.e. As Built Drawings, O & M Manuals which show the operation and …

Who can certify practical completion?

contract administrator
The contract administrator certifies practical completion when all the works described in the contract have been carried out. Certifying practical completion has the effect of: Releasing half of the retention (an amount retained from payments due to the contractor to ensure they complete the works).

What do practical completion inspections look for?

What is inspected for at Practical Completion / Handover:

  • Building defects.
  • Damage.
  • Cosmetic defects.
  • Quality of finish.
  • Fixtures and fittings.
  • Presence of appliances.
  • Presence of installations.
  • Incomplete work.

What happens when a certificate of practical completion is issued?

Once the certificate of practical completion has been issued, the client takes possession of the works for occupation . There is no absolute definition of practical completion and case law is very complex.

What do you need to know about substantial completion?

The contractor and owner develop and agreed on a substantial completion checklist tailored to the construction project. The list of items is specified inside the construction contract documents. The parties agree on using the certificate of occupancy issued by the local jurisdiction as the substantial completion milestone date.

What does practical completion mean in the RIBA Plan of work?

The RIBA Plan of Work 2013 suggests that: ‘ Practical Completion is a contractual term used in the Building Contract to signify the date on which a project is handed over to the client. The date triggers a number of contractual mechanisms.’

When does a construction manager issue a completion certificate?

Once all trade contracts (or all trade contracts for a particular section of the works) have been issued, the construction manager issues a certificate or project completion (or sectional completion). The same is true on management contracts, where each works contract must be certified individually.

About the Author

You may also like these